Attic adaptations

Remember!

Here is the translation of the Polish text you provided: If the attic was designated in the house project as usable, but we want to change its functionality,
we do not have to apply for a change of use.
However, the planned construction work still requires a permit or notification.
Works that do not require any formalities include, for example:
– connecting the attic to the attic or replacing existing water and sewage installations,
heating and electrical systems and installation of sanitary equipment, radiators, etc.;
– construction of partition walls;
– replacement of windows and doors without changing the size of openings;
– replacement of internal stairs;
– finishing the attic walls and laying floors on it;
– insulation of the roof and walls (if the building is not higher than 12 m);
– replacing the roof covering, but be careful! – only in a detached building and sufficiently distant from the plot boundaries (i.e. one whose area of influence does not extend beyond the plot).
A change in the use of the attic may be made within 2 years of its notification to the office (Article 71(4)).

Regarding attic adaptation, the new construction law (text of the act after the amendment – Journal of Laws of 2020, item 1333) provides for two options: reporting construction works to the office or obtaining a building permit.

Sesja na prezent

Voucher na sesje zdjęciową to oryginalna niespodzianka dla bliskiej osoby.
Prezent, który pozwoli zatrzymać magiczne momenty na fotografiach.

Skontaktuj się ze mną aby dowiedzieć się więcej…

884 189 350

najlepiej między  10:00 a 19:00

Email: biuro@artbymidwife.pl

STRONA W TRAKCIE BUDOWY!

Wróć do nas za kilka dni aby zobaczyć efekt końcowy :)